Endangered power plants
-
97%
- 97% of all power plants in Korea are small and medium-sized with capacity of less than 300kW.
- Power plants without professional O&M services
-
49%
- Power plants lacking post-maintenance due to the modules and bankruptcy of contractors
- The test results by Germany’s TUV-Rheinland show that approximately 49% of installed modules have issues in the long-term performance guarantee
Types of hidden module defects
-
Damage inside modules -
Modules with reduced efficiency -
Burnt-out internal terminals -
External issues of unknown cause
Technical due diligence is recommended to the following.
-
Those who are concerned about lower energy output
compared to nearby power plants or expected outcome -
Those who require an overall diagnosis
before/after various warranty periods for defects -
Those who require a system status diagnosis
before operating a new plant or after acquiring an existing plant
BACKGROUND
-
Professional manufacturer
- 20 years’ know-how in solar energy
- Production and partial repair of solar power modules
- Operation of professional research facilities and organizations
-
Operation and maintenance (O&M) capability
- Current maintenance capacity modified to 338.85 MW
- Accumulated O&M data
- Actual data-based energy output analysis
-
Visiting service
- Analysis of past energy output (As is)
- Estimation of future energy output (To be)
- Proposal of improvement direction for energy output
Technical due diligence performance
Project name | Conclusion date | Installation capacity |
---|---|---|
2012-2015 in all | 13 | 29.2 MW |
2016 in all | 13 | 34.2 MW |
2017 in all | 34 | 61.2 MW |
2018 in all | 42 | 176.3 MW |
2019 in all | 39 | 133.6 MW |
Total | 141 | 434.5 MW |
Samcheok Solar Power (Chambit No. 1 & 2) | Mar. 2019 | 1.8 MW |
Refinancing | Mar. 2019 | 9.9 MW |
Woori Energy | Mar. 2019 | 0.9 MW |
DS No. 4 | Mar. 2019 | 0.8 MW |
Saemangeum Solar | Mar. 2019 | 5.0 MW |
Cheongun Energy | Mar. 2019 | 1.3 MW |
Gisu Power Generation | Mar. 2019 | 1.0 MW |
Sunshine PJT | Feb. 2019 | 19.0 MW |
Hangyo Solar Power Plant Co., Ltd. | Dec. 2018 | 3.0 MW |
Ssigmalentek 3Wonju Solar Power Co., Ltd. and 8 other locations | Nov. 2018 | 15.0 MW |
Gwangsaeng Solar Power Plant | Nov. 2018 | 1.0 MW |
Yangsaengi Solar Power | Oct. 2018 | 1.0 MW |
Hwayak Boeun and 18 other locations | Oct. 2018 | 19.0 MW |
Hangyo Solar Power Plant Co., Ltd. | Sep. 2018 | 3.0 MW |
G Cell Solar Power (4 locations) and Mokpo (2 locations) | Sep. 2018 | 8.6 MW |
Wonjung Solar power | Sep. 2018 | 1.0 MW |
Haera Energy | Sep. 2018 | 1.0 MW |
Poseung Energy | Sep. 2018 | 1.0 MW |
Jinseongtu Solar Power | Sep. 2018 | 1.0 MW |
Seo-oh PV | Aug. 2018 | 1.0 MW |
Hun Solar | Aug. 2018 | 1.0 MW |
Bangchuk Solar Power | Jul. 2018 | 2.0 MW |
Hojin Solar One | Jul. 2018 | 1.5 MW |
Rhazes Solar Power | Jul. 2018 | 2.0 MW |
Woonji Solar | Jul. 2018 | 2.1 MW |
Dogye AnA eco-friendly Haetbit No. 1, 2, and 4 | Jun. 2018 | 1.7 MW |
Gaeryeong Energy | May 2018 | 2.0 MW |
Namjeon Energy | May 2018 | 2.0 MW |
Namhae No. 2 | May 2018 | 5.6 MW |
Sinan | May 2018 | 35.5 MW |
- We find and improve the cause of hidden loss in energy output to provide more stable and improved returns on power generation.
-
Total analysis of modules, systems, structures, sites, etc. based on the operation and maintenance (O&M) know-how of Korea's largest O&M company
※ It is a subsidiary of S-Energy Co., Ltd. with more than 20 years’ history based on outstanding solar module manufacturing and analysis technology. - Provides module precision analysis services in accordance with the IEC 61215 regulations
-
Site review
3D mapping
-
Material and equipment review
IR drone, Portable EL, Lab test
-
Energy output review
Simulation & real raw data analysis
-
Solution provision
Re-powering / renovation
Comparison to the services of other companies
Diagnostic category | other companies | (PV + ESS) |
---|---|---|
Diagnostic category | V | V |
Visual inspection of plants | V | V |
Determination of adequacy of design and construction | V | V |
Visual inspection of plants | V | V |
Visual inspection of connector boards | V | V |
Voltage/Current measurement for connector boards | V | V |
Inverter operation and installation status | V | V |
Inverter system diagnosis | V | V |
Diagnosis of electrical performance of modules | V | |
Measurement through thermal imaging cameras | V | |
Estimation of energy output & analysis of potential loss | V | |
Technical support for maintenance | V | |
Presentation of measures to improve energy output | V | |
Experimental analysis based on international electrotechnical standards (specialized labs and testing equipment in operation) | V | |
Verification of defects in major products | V | |
Verification of module components and scope of product repairs | V | |
Power analysis | V | |
Analysis of module and array output | V | |
Shading element analysis | V | |
Amount of insolation forecast data | V | |
Capable of diagnosing PV+ESS power plants | V | |
Inspection of civil engineering status (additional matters) | V | |
Drone shooting of thermal images | V |